Abstract
Construction of the buildings and services for the 20 MV tandem accelerator in Buenos Aires has been completed. The SF 6 gas handling system has been successfully tested up to a pressure of 9.8 kg/cm 2 absolute (125 psig). The accelerator column and injection systems have already been installed. High voltage tests have been conducted. A maximum voltage (24.7 ± 8)% MV has been reached on the terminal, well above the specifications of the system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Nuclear Instruments and Methods In Physics Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.