Abstract

Abstract Background The AEC practice using BIM technology in Central European (CE) context is still very young; the previous experiences demonstrated a number of upcoming problems with BIM implementation on technical- (heterogonous data, interfaces, large data volumes) but even more so on process-level (question of responsibilities and work-load distribution, lacking standards or conventions on building-representation and in general lack of experience and knowledge on integrated practice). The optimal data management, transfer and synchronization within inhomogeneous software context, as is often the case within inter-firm construction projects, require enormous organization, coordination and communication effort in the earliest design-phases. The BIM implementation implies therefore necessity of fundamental rethinking of the conventional design process, which in CE context is still predominantly based on sequential, segmented practice. Methods At the Vienna University of Technology a BIM-supported multi-disciplinary planning process with students of architecture, structural engineering and building physics, using several BIM-software tools was simulated. From the qualitative and quantitative evaluation of this BIM-supported multi-disciplinary collaboration will enable the compilation of guidelines for efficient use of BIM in design and planning process for the planners and standardization bodies. Results First insights on process-quality, such as team-, process- and technology satisfaction, as well as conflict- and stress levels will be presented in this paper. We were able to identify numerous technical problems related to the data transfer and inconsistencies in translation, which resulted in participant dissatisfaction and significant increasing of work-loads. Conclusion The first results imply at the importance of process-organization techniques such as face-to face communication, coordination and work-load allocation between the team-members in order to conduct the efficient BIM-supported process; as well as at urgent need for advancement of the tools in terms of data transfer and exchange. In the next step, using mandatory protocols and timesheets, a detailed statistical analysis of the people-process-technology issues will be conducted, as well as comparison of „Open-Platform-BIM“ to „One-Platform-BIM” model.

Highlights

  • The AEC practice using Building Information Modelling (BIM) technology in Central European (CE) context is still very young; the previous experiences demonstrated a number of upcoming problems with BIM implementation on technical(heterogonous data, interfaces, large data volumes) but even more so on process-level

  • In the student workshop through rough questionnaire answered by 19 students, a) satisfaction with BIM-technology, b) satisfaction with teamwork, c) satisfaction with process, d) conflict-level and e) stress-levels were questioned on the scale ranging from 0 to 6 (Table 1)

  • The general BIM-technology dissatisfaction resulted from data transfer problems, as reported especially by the building physicist (BS) students using TAS simulation software, where data exchange uses gbXML standard

Read more

Summary

Introduction

The AEC practice using BIM technology in Central European (CE) context is still very young; the previous experiences demonstrated a number of upcoming problems with BIM implementation on technical(heterogonous data, interfaces, large data volumes) but even more so on process-level (question of responsibilities and work-load distribution, lacking standards or conventions on building-representation and in general lack of experience and knowledge on integrated practice). The practice calls for more integrated design and planning process, which would enhance simultaneous collaboration of various disciplines for sharing and creation of new common knowledge. Building Information Modelling (BIM) is believed to bear large potential for inducing a shift from the conventional, fragmented practice, which still largely dominates the AEC (architecture, engineering and construction) industry (Fellows and Liu 2012), towards more integrated design practice (Prins and Owen 2010). BIM, in our understanding is much more about how (design of design process), than about what (building model and its properties)

Objectives
Methods
Results
Conclusion