Abstract

Combining with an instance of rectification and reinforcement of a brick-concrete structure house in the Yunnan province, a comprehensive landing method was proposed. The building was reinforced, for the existing problems, on the basis of the analysis of the building tilt reasons. In order to ensure building safety in the process of rectifying inclination, the anchor static pile was used. The result showed that the inclination rate of the building returned to 3 % from 14.4 %, which proves the effectiveness of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.