Abstract

The objective of this research is the application of the NR-18 checklist as a management tool for safety, health, work hygiene and quality of life for workers in the excavation applied to the construction of the underground dam. The study was carried out in a civil construction work in progress, in order to verify compliance with the work safety legislation in a work after determining the area for renting the underground dam. The verification method was adopted, as it is considered a means of easy measurement and understanding, and is widely accepted in the security area, with a focus on item 18.6. All visits were accompanied by a professional responsible for the execution, and authorization was requested to photograph the construction site. The NR-18 has 26 items to be analyzed at the construction site and of these only 2 were in compliance with the regulations, they are the items order and cleanliness and living area, the items that were not in compliance are safety signs, excavations and PPE's.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call