Abstract
In the Jinzhong Road (ACR Main Road - ACR Eastern Section) Reconstruction Project in start up area of Xiamen Cross-strait Financial Centre, mud-water balance method was adopted and successfully jacked 2.4m diameter double-hole jacking pipes for 558m. This essay demonstrates the design of pipe jacking in this project and key points of construction and management, which accrues experience for large-diameter pipe jacking under Xiamen specific geological condition in the future.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Engineering and Technology Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.