Abstract

This paper analyzes arc phenomena including the secondary arc's elongation in the Korean 765kV single transmission line (79km) between Sin-Ansung S/S and Sin-Gapyeong S/S, which will be installed in Korea in June 2006. In particular, both frequency independent and frequency dependent line models are compared to make our final decisions. As well, the significant simulation results are investigated by the EMTP program. As a result, there is no need of HSGS in the Korean 765kV single transmission line from both a practical and an economical point of view.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.