Abstract

The design of the Imig Music Building addition at the University of Colorado/Boulder, which started in 2017, culminated in a building opening in Spring 2021. The facility includes a dedicated recital hall, a large ensemble rehearsal room with flexibility to double as a recital hall, a choral rehearsal room, theatre rehearsal room, and dance rehearsal studio along with many music teaching studios, practice rooms, and other acoustically sensitive spaces to support the College of Music’s program. The footprint of the building addition was very limited, resulting in an unusually large number of acoustically critical horizontal and vertical adjacencies. Perspectives on the design process and the successful resulting building will be presented by the end user and the acoustician. One goal of this presentation is to help attendees understand how to translate end user goals into acoustic design criteria and communicate those criteria to the other design team members (architects, engineers, and other specialty consultants such as theatre consultants).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.