Abstract

Several IEC 61850-based protection and control schemes were recently implemented for the new electrical system at a North American oil refinery. IEC 61850 GOOSE messaging was used for several schemes including transfer tripping, breaker failure, islanding detection, remote synchronizing, automatic restoration, manual transfer, and load shedding. Site acceptance tests validated operation of the protection and control schemes. Bench testing was also performed for the load shedding scheme using a power system simulator. All of the testing focused on verifying scheme operation during normal operation and failure modes. Lessons learned during testing early on in the project influenced the design and testing of subsequent schemes. This paper describes the bench testing and site acceptance testing approaches. Example tests will be described along with test results of interest and lessons learned.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.