Abstract

For the HERA luminosity upgrade two types of compact multifunction superconducting magnets, denoted GO and GG, are needed for installation inside the existing ZEUS and H1 experimental detectors in the year 2000. These magnets contain multiple concentric coil layers organized into independently powered quadrupole, dipole, skew quadrupole and skew dipole coil windings. Production of the first of three GO magnets using a newly constructed coil winding machine is currently in progress at BNL. The GG design is being completed and parallel production at BNL of three GG units will start soon. In this paper we highlight HERA upgrade magnet design challenges, present our production solutions and relate experience and results gained from warm and cold testing of short model magnets.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call