Abstract
Temporary traffic control (TTC) strategies have been widely adopted to maintain traffic flow while ensuring TTC costs remain a reasonable portion of construction budgets. As travel demand approaches the capacity of an existing facility, implementation of an appropriate TTC strategy is increasingly important not only because lane closures on these facilities exacerbate existing delay, but also because speeds associated with congestion contribute disproportionately and non-linearly to roadway emissions produced throughout the lifetime of the roadway. To enable stakeholders to make informed and transparent decisions on selecting a TTC strategy so as to balance the trade-offs among construction cost, traffic delay, and energy consumption, this paper discusses the development of an integrated model that identifies the Pareto-optimal front when construction start time, construction duration, lateral clearance, and width of shoulder borrowed as a through lane are considered as decision variables. A test implementation of the model suggests that when construction budgets are low, strategies for decreasing traffic delay differ significantly from those for decreasing energy consumption; however, as construction budgets increase, the objectives on traffic delay and energy consumption align much better.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.