Abstract

The objective of this study was to compare the temperature dependence of a scintillation survey meter with and without the temperature compensation function. Investigation of temperature dependence is important to make precise measurements in various environments. The experiment was conducted using the NaI (Tl) scintillation survey meter with the temperature compensation function (TCS-1172) and the NaI (Tl) and CsI (Tl) scintillation survey meters without the temperature compensation function (TCS-171, PDR-111). In all, 1 cm dose equivalent rate (µSv/h) was measured by changing the room temperature from 10 to 40 degree Celsius. The results showed that the scintillation survey meter with the temperature compensation function had almost no change in the measured values with changes in room temperature, whereas the 1 cm dose equivalent rate of the scintillation survey meter without the temperature compensation function changed by a maximum of -7.2 (%/10°C) as temperature increased. This study confirms that the scintillation survey meter with the temperature compensation function was less dependent on temperature, and stable measurement was possible. However, it was suggested that the scintillation survey meter without the temperature compensation function might cause a drop in the measured value as the temperature rises.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call