Abstract

Railway tracks require more thorough maintenance and analysis than regular roads for cars. Defects are here noticed and recorded by using special equipment. Construction of railway roads and their exploitation requires optimal accuracy and monitoring of surveying. It is related to maximum allowed speed of trains, the environment, transport and human safety. In order to highlight complex problems of railway road exploitation, the evaluation of railway roads was conducted. Problem areas of railway maintenance were identified. Their monitoring needs to be improved by applying geodetic devices for surveying. Comparing analogous surveying conducted using EM140 machine with that of geodetic equipment, one can see the advantage of geodetic surveying. Technical gaps in the surveying process, data storage and procession were evaluated as well. It was discovered that maintenance and monitoring works should be pursued more frequently using high accuracy geodetic equipment. Key words: railway, geodetic surveying, accuracy of surveying, EM140.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.