Abstract
The fast deployment of renewable energy in Italy by 2030, according to the National Energy and Climate Plan, will lead to renewable electricity surplus mainly in Southern Italy where adequate energy storage is not currently available. In this paper, a Power to Green Hydrogen followed by a methanation process is proposed to accelerate decarbonisation and the integration of higher shares of variable renewable energies in Southern Italy. Green hydrogen can be injected directly into the natural gas grid or used to produce biomethane that can be injected afterwards into the natural gas grid. The main results of our assessment are: 1) 819 – 1,638 Mm3 green hydrogen that could be produced by water electrolysis using the renewable electricity surplus; 2) 160 Mm3 biomethane produced through biogas upgrading and 3) 14 – 117 Mm3 additional biomethane produced through methanation by using biogenic carbon dioxide from biogas upgrading. The approach would enable a) green hydrogen production cost competitive with grey hydrogen (44 €/MWh) only when the electrolysis system uses electricity for free and its load factor is above 1,800 h/y and 5,000 h/y for the optimistic and conservative case, respectively; b) biomethane production cost via biogas upgrading (about 58 €2020/MWh); and c) biomethane production cost via methanation competitive versus natural gas price (30 €/MWh) only when using electricity for free and operates at full load for over 5,400 h/y in the optimistic case.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.