Abstract

PT. Rencana Mulia Baratama is one of the companies engaged in coal mining in Long Beleh Village. The area of WIUP OP owned is 3,993 ha with a Production Forest Area of 2,630.4. The drainage system applied at PT. Mulia Baratama's plan is Mine Dewatering, which is by flowing all runoff water into a well (sump) to be pumped out of the mining area which flows into the settling pond. The well is a place that serves to hold a temporary amount of water before being pumped out The actual volume of the well in pit 1 is 58,000 m3. The planned rainfall period based on the 5-year rain reset period is 179.473 mm/day and the duration of rain is 2.4 hours per day. So that the amount of rain intensity calculated by the monobe equation is 37.39 mm/hour. The total water discharge entering the mining site is 58,817,254 m3/day which comes from runoff water discharge of 13,260,552 m3/day and rainwater discharge of 45,556,704 m3/day. The pumping discharge carried out is 462.4 m3/hour using one type of centrifugal pump 200x150 using Rpm 150 so that the total water discharge that can be drained in a day is 7,398.4 m3/day.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.