Abstract
The new regulation of Indonesia Energy and Mineral Resource Minister PERMEN ESDM 50, 2017 changed the tariff of mini-hydro power plant in the Bandung Regency from Rp. 1,200/kWh to Rp.850/kWh. Although the tariff change, the regulation is going to be build owned after 20 years. It needs investment recalculation according to the new tariff. The technical studies show the potential electrical energy and the turbine’s type. The financial analysis provided the feasibility of the project used IRR, NPV, and Payback period method. The variable used is the EPC cost of some turbine brands and civil work. This paper informed that the project is feasible for investment and construction. The results of the calculation are IRR 9,69%, NPV RP. 8.373.579.334 and the Payback period 7 years and 9 months.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.