Abstract

The mathematical model is presented for the purpose of management the performance indicators of the park of control and measuring equipment used in construction and the housing and public utilities sectors. The model is based on performance management algorithms that ensure a smooth monotonous transition of indicators from current values to the required values for a fixed period of time. The smoothness of the transition is ensured by using the pieces of monotonic degree functions as a reference plan. The developed algorithms make it possible to effectively build preliminary target plans, as well as to make refined plans in the event of underfunding (refinancing) at individual planning stages. The main directions of development of the technical base of park of control and measuring equipment are the modernization of existing samples and types of control and measuring equipment as a result of scientific research and development work, as well as the purchase of new advanced control and measuring equipment to replace obsolete samples of control and measuring equipment. The article presents the results of mathematical modeling of the specified directions of development of the technical base of park of control and measuring equipment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.