Abstract

The reasonable dispatching and scheduling of the Tandem Quay Cranes and trucks is the foundation to improve the efficiency of the container terminals. Under the base of single lift quay cranes research, a research on Tandem Lift Quay Cranes and Yard Trucks scheduling is carried on in this paper. A mixed integer programming (MIP) model can be built to solve an integrated tandem lift quay crane and yard truck scheduling problem (i-TLQCYT). A Local Sequence-cut Method is applied to solve the model. Then the shortest time to complete the unloading operations can be got.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.