Abstract
Quay crane and yard truck scheduling are two important subproblems in container terminal operations which have been studied separately in previous research. This paper proposes a new problem for the integrated quay crane and yard truck scheduling for inbound containers. The problem is formulated as a mixed integer programming (MIP) model. Due to the intractability, a genetic algorithm (GA) and a modified Johnson's Rule-based heuristic algorithm (MJRHA) are used for the problem solution. In addition, two closed form lower bounds are given to evaluate the solution accuracy. Computational experiments show that the solution algorithm can efficiently handle the scheduling problem and that the integrated methods are very useful.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.