Abstract

The article describes the significance of the Developer’s (Technical Customer) construction compliance control mechanism as an effective tool of reducing potential risks in investment and construction projects. It contains a general description of the practice of attracting organizations to conduct construction monitoring, a need for an integrated, systematic approach to the process of work acceptance. The proposed scheme of the comprehensive verification control including the laboratory validation of the Contractor’s data for the purpose of optimization and improvement of control functions was analysed using existing statistical methods. There have been indicated ways of determining qualitative and quantitative characteristics of the sample (verification control) from the universe common array (the source control of the Contractor) in compliance with the representativeness terms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.