Abstract
The optimal process design of a dual purpose plant for producing power and water is investigated. A nuclear reactor and steam turbine power generator for steam and power production is coupled with two water plants, a multi-stage flash plant and a reverse osmosis plant. The total system cost for producing given levels of power and water is minimized. Optimal designs are presented for several combinations of water and external power demands ranging from 25 mgd to 150 mgd and from 50 MWe to 200 MWe.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have