Abstract
The overall goal of the European co-financed H2-IGCC project was to provide and demonstrate technical solutions for highly efficient and reliable gas turbine technology in the next generation of integrated gasification combined cycle (IGCC) power plants with CO2 capture suitable for combusting undiluted H2-rich syngas. This paper aims at providing an overview of the main activities performed in the system analysis working group of the H2-IGCC project. These activities included the modeling and integration of different plant components to establish a baseline IGCC configuration, adjustments and modifications of the baseline configuration to reach the selected IGCC configuration, performance analysis of the selected plant, performing techno-economic assessments and finally benchmarking with competing fossil-based power technologies. In this regard, an extensive literature survey was performed, validated models (components and sub-systems) were used, and inputs from industrial partners were incorporated into the models. Accordingly, different plant components have been integrated considering the practical operation of the plant. Moreover, realistic assumptions have been made to reach realistic techno-economic evaluations. The presented results show that the efficiency of the IGCC plant with CO2 capture is 35.7% (lower heating value basis). The results also confirm that the efficiency is reduced by 11.3 percentage points due to the deployment of CO2 capture in the IGCC plant. The specific capital costs for the IGCC plant with capture are estimated to be 2,901 €/(kW net) and the cost of electricity for such a plant is 90 €/MWh. It is also shown that the natural gas combined cycle without CO2 capture requires the lowest capital investment, while the lowest cost of electricity is related to IGCC plant without CO2 capture.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have