Abstract

The performance of precast construction is highly dependent on the effectiveness of production planning for the precast components (PCs). However, existing studies focused primarily on the separate mathematical optimization of production scheduling or resource allocations using heuristic algorithms without considering the interactions between each other and the flexible production environment. This paper proposes a multi-agent based precast production planning model to synchronize the production scheduling and resource allocation. In this model, the on-time delivery, minimum waiting and extension time are achieved using a two-hierarchy resource constraints based production scheduling optimization method. Further, the heuristic algorithm is presented to integrate the optimization techniques with the competing goals shown in a multi-agent system. Finally, a real case is conducted to verify the performance of the proposed model. The results demonstrate that 9.1% and 27.4% cost savings can be achieved by comparison to the actual scheduling method in practice and the traditional scheduling methods without considering the resource constraints, respectively. This proposed methodology will support flexible and optimized decision makings on the precast production planning.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.