Abstract

A synchronization system for the Gamma-4 four-module electrophysical facility has been developed. It has been shown that the synchronization system should provide triggering (with precision not worse than ±3 ns) of the high-voltage gas-filled trigatron-type switches of the facility modules (144 spark gaps with an operating voltage of 1 MV), the pre-pulse switches of the modules (24 spark gaps with an operating voltage of 3 MV) and eight Arkad’ev-Marx generators (40 spark gaps with an operating voltage of 100 kV).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call