Abstract

With the increase in operating voltage of transmission system to transport large amounts of power to meet increased demand switching surges became governing factor in the insulation design of EHV and UHV systems. Insulation failure probability under switching surges that is switching surge flashover rate (SSFOR) is the main concern in the switching surge design of transmission lines. In this paper, SSFOR of 1200kV UHVAC transmission line under switching surges which are generated during energization of no-load transmission line is estimated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.