Abstract

We attempt to present in this paper a critical review of a particular segment of scheduling research in which the due to date assignment decision is of primary interest. The literature is classified into the static and dynamic job shop situations. The static job shop is analyzed from two different perspectives: the due date is constrained to be greater than or equal to makespan, and the optimal due date and optimal sequence are to be determined when the method of assigning due dates is specified. The literature on dynamic job shops is also reviewed under two broad categories. First, we discuss all the literature concerned with comparative and investigative studies to identify the most desirable due date assignment method. Second, we discuss the literature dealing with determination of optimal due dates. We note that computer simulation and analytical methods are two common approaches for the second type of problems. We observe that while the static single-machine problem with constant or common due dates has been well researched, very little or no work has been done on the dynamic multi-machine problem with sophisticated due date assignment methods. Finally, we identify and suggest some worthwhile areas for future research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.