Abstract

One of the design targets for the Tokamak Exhaust Processing (TEP) system of ITER is not to lose more than 10-5gh-1 into the Normal Vent Detritiation system of the Tritium Plant. The plasma exhaust gas therefore needs to be processed in a way that a tritium removal efficiency of about 108 with respect to the flow rate is achieved. Expressed in terms of tritium concentrations this corresponds to a decontamination from about 130 gm-3 down to about 10-4 gm-3 (about 1 Cim-3 = 3.7*1010 Bqm-3). The three step reference process for the TEP system of ITER is called CAPER and has been developed and realized at the Tritium Laboratory Karlsruhe (TLK). After the successful commissioning of the PERMCAT reactor as the key component of the third step detailed parametric tritium testing of the 3 steps involving the processing of more than 300 g tritium has been carried out and decontamination factors beyond the design requirements have been demonstrated for each process step and for the process as a whole. Not only the decontamination factor of 108 as required by ITER, but also the operational mode of TEP as a waste dump for gases from diverse sources has been experimentally validated with the CAPER facility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.