Abstract

The paper, describes the historical background, development, design, execution and works' full-power full-pressure tests of submerged gas-circulator equipment rated 5 MW at 3000 rev/min for 11 kV, 50 Hz, 3-phase supply. The environmental requirements, due to the nuclear reactor, of 40 atm of CO2 with operation down to 1 atm of air, need careful consideration from various motor-design aspects: aerodynamic, thermodynamic, lubrication, dielectric etc. The complex equipment requires the closest integration of design between the ‘mechanical’ and ‘electrical’ constructor as well as the reactor constructor, and illustrates several interesting and/or novel features. Brief mention is made of the impact of changing the environment to helium.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.