Abstract
Sutong GIL Integrated Pipe Gallery Project is a 1000 kV AC UHV transmission project, which is the world’s first long-distance 1000kV GIL equipment cross-river power tunnel. The long distance of this project, the large amount of heat generated by the equipment, and the possibility of SF6 gas leakage inside the tunnel make the design difficult for the ventilation system. In this paper, the ventilation problem of Sutong GIL integrated pipe gallery is studied to determine the ventilation condition in this pipe gallery.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.