Abstract

With the development of the city, the advantages of the integrated pipe gallery are becoming more and more obvious. In recent years, the government departments have also intensified efforts to promote the construction of urban integrated pipe gallery. The prefabricated pipe gallery can save all the template costs, and there is no wet operation on site. Most of the process is completed in the prefabrication plant, the labor cost is greatly reduced, and the construction period is greatly shortened. Improve and optimize the design and installation technology of unequal gantry cranes and pipe lifting and installation technology, and improve the overall ergonomics of prefabricated pipe installation through rapid installation of prefabricated pipes. During the installation process of the prefabricated pipe gallery, according to the characteristics of the installation of the pipe gallery, the new technology and new equipment are used for the flow-through operation, which can realize the integrated construction work of quick unloading, hoisting, turning and installation of components, greatly improving the installation efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.