Abstract

In this paper, the bi-directional four-lane traffic organization plan and its key factors in the freeway reconstruction and expansion were analyzed. Combined with the actual traffic flow and construction conditions of the freeway network in Chang-zhang Freeway project, the bi-directional four-lane traffic organization plan for the Chang-zhang Freeway reconstruction and expansion were determined, including the construction area length and construction sequence. It systematically summarizes the advantages and disadvantages of the traffic organization and management of the Chang-zhang freeway reconstruction and expansion project. It provides reference cases for the subsequent traffic organization design of freeway reconstruction and expansion similarly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.