Abstract

This paper mainly studies the joint application about BIM technique and three-dimensional (3-D) simulation of traffic organization. It is the first time to systematically break through the application bottleneck of BIM technology in traffic organization design and implementation of highway reconstruction and expansion project, which realize the vertical connection between BIM software and 3-D simulation of traffic organization data to the visual evaluation of traffic conditions by analyzing the visual electronic sand table. An interconnection between 3-D visual simulated data flow and Vissim transportation analysis data is also built up to highly restore the real traffic conditions under the implementation of traffic organization plan, which help us evaluate road capacity of diversion section, provide a guidance to design and implement the transportation proposal, and improve the efficiency of implementation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call