Abstract

The current constructional project have significant influence on the traffic system in the evaluation scope by TIA, the modification of the regulatory detailed plan and the plan conditions proposed is impossible for its characteristic of ex-post evaluation. Thus the effectiveness of TIA is greatly reduced. This paper discusses this issue and puts part of the content of TIA upward into regulatory plan stage. The focus and content of each stage can be clearly assigned by the integration of comprehensive transportation system plan in master plan, TIA in regulatory plan, TIA in constructional detail plan and project design. Furthermore, the paper introduces the measure which was put forward in urban comprehensive transportation plan of Bayuquan District in Yingkou City and TIA was applied in regulatory plan of Wanghai new District. By improving the method and testing the effects, the role of TIA can be further enhanced.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call