Abstract

The transmission of offshore wind farms faces the problem of shortage of transmission corridor resources. It is necessary to consider how wind farm clusters are densely connected to the power grid. The design of the topology needs to be further optimized, and the power supply layout and grid structure need to be analyzed during the planning and construction period of the grid. Therefore, this paper analyzes the study requirement for the optimization of the topology of the offshore wind power AC / DC connect to grid. When the wind farm is close to the land and distributed, the AC integration can be used and the connect points are distributed in the power grid to reduce the impact of wind power fluctuations on the AC power grid.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.