Abstract

Due to the high flow velocity and easy cavitation of high-head drainage tunnels, it is usually necessary to set up aeration facilities. In particular, when the bottom slope of the tunnel is mild, the aeration facilities often have problems such as difficulty with air intake, short cavity, and serious water accumulation, which aggravate the risk of cavitation damage. In this paper, based on the Rumei hydropower station and the Gushui hydropower station, a method combining theoretical analysis and model testing is used to solve the connection problem between the aeration facility and the 3% mild bottom slope of a tunnel body, and the aeration facility shape of “lifting ridge + flat (mild) slope + steep slope” is put forward. The research shows that the steep slope section can smoothly connect the water flow over the cantilever, reduce the jet impact angle, prevent the water from backtracking, and produce a long and stable cavity in the flat (mild) slope section. The aeration concentration along the bottom of the tunnel is higher than 3% at 140 m over the top of the dam. The aeration effect of this type is better, and it can provide effective long-distance protection for a drainage tunnel with high head and a mild bottom slope.

Highlights

  • Cavitation erosion was first found in military destroyers and turbine propellers and appeared 30 years later in high-head drainage structures of hydropower projects

  • Cavitation erosion damage is the main hydraulic safety risk faced by high-head drainage tunnels, which seriously endangers the safe operation of drainage buildings

  • For a spillway tunnel with a mild bottom slope, when the water head is high, the Fr number is low, and the aeration facility is prone to problems such as cavity instability, serious water accumulation, and difficulty with air intake, it cannot effectively perform its aeration erosion reduction function

Read more

Summary

Introduction

Cavitation erosion was first found in military destroyers and turbine propellers and appeared 30 years later in high-head drainage structures of hydropower projects. For a spillway tunnel with a mild bottom slope, when the water head is high, the Fr number is low, and the aeration facility is prone to problems such as cavity instability, serious water accumulation, and difficulty with air intake, it cannot effectively perform its aeration erosion reduction function. The model test was designed using the gravity similarity criterion, and the geometric scale Lr. The empty sand flushing tunnel of the Gushui is composed of aeration sill and the downstream bottom slope werehydropower carried out. We propose an aeration an inlet section, access gate chamber, pressurized section, underground working gate facility shape of “lifting ridge + flat (mild) slope + steep slope”, which is suitable for a chamber, and bottom flip lifting section.

Analysis of
Mild Bottom Slope Aeration Facility Shape
Aeration Concentration
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.