Abstract
By using the finite element method, the settlement of soft soil subgrade with a crust layer has been investigated. To find the influence of thickness of the crust layer on the settlement, four different thicknesses, which are 0.0m, 1.5m, 3.5m and 5.5m, are selected. Besides, the settlement during the construction and post construction are also analyzed. It is found that the crust layer can reduce the settlement and uneven settlement of subgrade effectively. Besides, the settlement of the subgrade decreases with the increase of the thickness of crust layer. Moreover, with the increase of time, the uneven settlement of the pavement increases gradually. And when the time is up to a certain degree, the uneven settlement tends to be stable.