Abstract

Directional excavation technology in the coal mine laneway is the important research direction of integrated excavation project. This paper studies the changes of cutting section shape and boundary values caused by the swing of boom-type roadheader's cutting arm ​​to calculate the maximum values of compensable pose deviation when cutting, as the research basis for the accuracy analysis of boom-type roadheader's directional excavation. This paper gives the calculation method of cutting arm control, spatial modeling and analysis of cutting head position changes caused by cutting arm in thought of the three-dimensional analytic geometry, and also gives verification in the way of Matlab graphics simulation. At last, a control method to compensate section boundary by cutting arm is put forward.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call