Abstract

To solve the problems of increased delay time spread and weak ignition capacity in the case of B/KNO3 lead cable ignition charge structure under high overload conditions. Several improvement and optimization measures were taken. Such as increasing the pressure of B/KNO3 ignition powder, increasing the strengthening cap, reducing the particle size of boron powder and pressing the empty shell at the output end. The performance of the improved and optimized delayed ignition device was verified by the 23-tooth hammering test. Results showed that the delay time, delay precision and ignition capacity of the improved delay ignition device met the requirements under the condition of high overload.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.