Abstract

In order to analyze the different construction program under the tunnel surrounding rock stress, strain and plastic zone changes, we take water tunnel group of nuclear power plant as basic project and the application of software FLACIS3D numerical simulation.The results show that: During the tunnel excavation and support group process, the different rock tunnel construction program can produce different stress, displacement and plastic zone extended range of distribution and other aspects.To interval-type excavation program,although previously disturbing effect of the excavation of the tunnel construction and tunnel excavation of rock, it can generate less impact on the stability of surrounding rock. For the latter excavation of the tunnel, the tunnel project area affected by the first digging,the stress can be released, the stability of the first excavation of the tunnel effect is also small.Comparing to sequential and parallel program-type excavation program, the use of interval-style group of rock tunnel excavation will help stabilize the body.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.