Abstract

The impact of the large-scale new energy power station on the near-zone of DC receiving end power grid was studied in this paper. Firstly, the basic situation of the new energy power station and the near-zone of DC receiving power grid was introduced, and the structure of the power grid and installed power supplies in the near-area grid were analyzed. Secondly, the model analysis of thermal power units in the near area and the new energy power station was carried out. Finally, a simulation analysis of the fault recovery capability of the new energy power base connected to the near-zone of DC receiving end power grid based on PSASP was conducted, and it was concluded that the commissioning of Multi-energy complementary megawatt new energy base has no noticeable impact on the voltage recovery capability of the near-zone of DC receiving end power grid.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.