Abstract
Although real-time tracking and feedback were carried out for the dam concrete construction process, there was still certain blindness in the construction units. The temperature double-control index, which is the allowable temperature and temperature gradient under typical age before concrete block reaching its maximum temperature, was proposed in this paper on the basis of the analysis of measured temperature process curves of concrete blocks. The probabilistic method was applied to draft the temperature double-control index of different sections and periods based on the measured temperature process curve of the poured block of a constructing extra-high arch dam in southwest China. Furthermore, the prediction model was also provided and applied in the dynamic feedback of new pouring block. It is demonstrated by the practice that the prediction model proposed in this paper has better pertinence and maneuverability for the construction units to control the maximum temperature of concrete block, i.e. the maximum temperature in high temperature season and in low temperature season are both controllable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.