Abstract
This paper takes the east extension project of Qiushi elevated road as an example, according to the planning and status quo situation of the project, combined with the traffic forecast and the analysis of the status quo, through the comprehensive selection of the program, the most reasonable scheme is selected from the aspects of scheme feasibility, traffic function and economy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have