Abstract

Considering the requirement of Shenzhen power grid development, this paper investigates the parameters selection for 220/20kV gas insulation transformer, including capacity, short circuit impedance, cooling mode, insulation level, over-load capability, temperature rise tolerance, loss , noise level and bushing selection. For different capacity value, the investment and loss concerning substation, 220kV grid and 20kV grid are analyzed and compared, by which the final capacity value is determined. The short circuit current level, transformer loss, manufacturing capability and investment is investigated to determine the short circuit impedance for the gas insulation transformer. The characteristic and application condition of gas cooling as well as liquid cooling mode is studied and the cooling mode for the gas insulation transformer is determined. The insulation level, overload capability and temperature rise tolerance are determined by considering related standards and the requirement of Shenzhen. The loss and noise level for the gas insulation transformer is determined by considering related standard and parameters of the domestic gas insulation transformers in operation. The gas-gas bushing is used to connect cable box and the transformer.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.