Abstract

Focusing on a particular assembly line balancing problem of which the task time is a stochastic variable, a stochastic model is established, which aimed at maximization of assembly line balancing rate, completed probability and smoothness index. Simultaneously, an improved particle swarm optimization algorithm is proposed to solve this problem and a reasonable chromosome coding method which effectively prevent to generate infeasible solution is designed. For this reason, the algorithm convergence rate could be improved. At last, rear axle assembly line balancing designs of an automotive part company is taken to test validity of algorithm. Availability of the algorithm is verified by this example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.