Abstract

This study aims to improve the assembly manufacturing process to solve the workload imbalances by combining value stream mapping (VSM) and ranked positional weight (RPW). An empirical study was conducted in a defense manufacturing firm located in Indonesia. The study specifically focused on 155 components and 56 tasks distributed among 43 assembly workstations in one weapon product. The results of the analysis showed a significant reduction in the total cycle time, from 5121 s (85.35 min) to 3620 s (60.33 min), or a decrease of 29%. Additionally, the study found improvements in the balance of the assembly line as measured by balance delay, line efficiency, and smoothness index performance indicators. The application of VSM and RPW in this study is unique in the context of the defense industry, as it provides empirical analysis on cycle time and assembly line balance, which is rarely studied. The results of this study contribute to the advancement of literature in the field and provide valuable insights for other organizations in the defense industry and other manufacturing industries. By improving the efficiency and balance of the weapon assembly line, this study has the potential to increase productivity and reduce waste.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.