During the construction of Ultra High Voltage (UHV), new technology and new equipment used in the construction of overhead transmission line emerge in endlessly. At present, some construction units lack of the cognition of such new technology and new equipments, more rely on the experience of the configuration of construction equipment, resulting in some of the new technologies are difficult to apply in construction. Thus, relevant standardization needs to be researched. Study on the standardization of primary guide rope laying by multi-rotor aircraft in stringing construction of transmission line, forms a standardized construction method, it provides a new intelligent and efficient technology, meanwhile reduces the resource cost, which is practical for the application of the whole process of mechanized construction of transmission line.