Abstract

This paper discusses how to predict burst hazard when advancing a tunnel through a gassy coal seam in order to prevent gas burst disaster during tunnel excavation. It covers prediction of burst hazard for Huayan Tunnel of Chengdu-Chongqing Expressway in the city of Chongqing before its left tube is advanced through a gassy coal seam at ZK3+200. The prediction result is reliable and has ensured the safety and stability of the Huayan Tunnel while it is advanced through the gassy coal seam.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.