Abstract

With the development of energy storage technology, energy storage power station has gradually become one of the main means to solve the voltage instability of the main network caused by uHV DC bipolar phase lock. Therefore, energy storage model has become a difficulty in research. Firstly, the structure model of power storage station participating in power grid voltage transient stability control system is constructed, and the control strategy of power storage station is analyzed. Secondly, in the power system analysis software package (PSASP), the ES model of transient voltage stability control is established by using user-defined modules, and each module in the model is introduced in detail, so as to realize the purpose of enhancing voltage transient stability control of energy storage power station connected to the power grid. Finally, the simulation results show that compared with the adjustable camera, the voltage recovery speed is faster when the same capacity ES is connected in the same place. For example, the voltage recovery speed of 110kV bus decreases from 2.42s to 1.69s, and the recovery speed is increased by 30.17%. And PCS of ES power station has enough short time (<1s) overload capacity, then the ES configuration capacity can be less than the camera capacity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.