Abstract

The main mode of pile-soil interaction and the influence factors of pile sinking in offshore platform construction were analyzed and discusses the reasons that penetration resistance increases after stop driving and then continue. To study the drivability of piles of specified driving hammer, taking a jacket platform of Bohai Sea for instance, the results showed that continuous driving will make the open-end steel piles be driven to the designed depth, and driven-on will cause soil plug and pile driving refusal. Based on the results, the paper gives some suggestions about pile driving.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call