Abstract

Comprehensive tradeoff control on quality, construction duration, cost and resource equilibrium is main aspect of construction project management, and is significant for improving the benefits of construction projects. In this paper, firstly the time-cost relationship model, the quality-time relationship model and resource equilibrium-time model are set up separately, objectives of quality and resource equilibrium are introduced to traditional time-cost optimization model for comprehensive optimization. Furthermore, multiple objective model of schedule is established by synthesizing single-objective models of quality and resource equilibrium. Then, based on TOPSIS, comprehensive optimization scheme is selected according to relative approach degree. Finally a case study is presented to verify feasibility and practicability of method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.