Abstract

Due to several mutual conflicting optimized objectives in the hybrid flow shop scheduling problem, its optimized model, including three objectives of make-span, flow-time and tardiness, was firstly set up, instead of the single optimized objective. Furthermore, in order to improve the optimized efficiency and parallelism, after comparing the normal multi-objective optimized methods, an improved NSGA-II algorithm with external archive strategy was proposed. Finally, taking a piston production line as example, its performance was tested. The result showed that the multi-objective optimization of hybrid flow shop scheduling based on improved NSGA-II provided managers with a set of feasible solutions for selection in accordance to their own preference. Therefore the decision could be made more scientific and efficient, and thus brings to the factory more economic benefits.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.